Wastewater Treatment Facility
- News
- Related
Pages - Services
TriCo Water Resource Recovery Facility
Treatment Facility Capacities:
Average Design Flow = 5.72 MGD
|
Clarifier 1 - 70' Diameter = 3.0 MGD Maximum Flow |
Average Design Flow Peak = 5.85 MGD |
Clarifier 2 - 70' Diameter = 3.0 MGD Maximum Flow |
Maximum Flow = 23.0 MGD
|
Clarifier 3 - 70' Diameter = 3.0 MGD Maximum Flow |
Orbal Design Flow = 1.05 MGD |
Clarifier 4 - 70' Diameter = 3.0 MGD Maximum Flow |
Vertical Loop Reactor Design Flow = 4.67 MGD
2 MEVA Rotorscreens
5 Aerobic Digesters - 1.33 Million Gallons of Biosolids Capacity
|
Clarifier 5 - 70' Diameter = 3.0 MGD Maximum Flow Clarifier 6 - 70' Diameter = 3.0 MGD Maximum Flow |
If you're interested in a Plant Tour, contact Scot Watkins to make an appointment. Tours are available Monday through Friday, 9:00am to 2:00pm.
The wastewater plant is certified as Wildlife-Friendly - click here for more information.
Contact Us
Scot Watkins,
Superintendent
Superintendent